Multiple SAP ERP Systems to single APO system
Hello, We have the following scenario of 2 ERP systems being integrated to a single APO system, the scenario details are as follows: System Logical system Business System Group...
View ArticleForecast release to excel sheet instead of SNP or ECC
Hi Experts, In one of our requirement , we have to release forecast from APO DP to Excel sheet for new business. This excel sheet forecast will again get uploaded manually to ECC later on. Our current...
View ArticleDependent Requirement in R/3, is not been CIF to APO as Dependent Demand
Hello Guru, I would like to ask help with regards to our issue, we have a certain material in a plant which is material type is HALB. in MD04 in R/3 it has a Dependent Requirement, but this demand was...
View ArticleActivation standard MPOS 9ASNPBAS
Hi all We are setting up a new SCM system and I have the following error regarding the SNP MPOS. I run the report /SAPAPO/TS_D_OBJECTS_COPY with no errors and then when trying to activate MPOS 9ASNPBAS...
View ArticlePPDS Alerts
Hi all I have the following requirement. I need to set up an alert to show that a a sales order has a problem because not all the levels ara ok or some components are missing. Sales orderProduction...
View ArticleVendor capacity planning with CTM
HiDid any one use subcontracting Vendor capacity in relation to CTM?We use SNP CTM with standard subcontracting solution ( using SNP PDS and subcontracting inforecords/contracts). We have a requirement...
View ArticleHow to copy Macros from Quality system to Development System
Hi Experts, I was trying to manipulate allocation procedure in the planning area when accidentally a custom planning book was deleted. I have created the planning book again, but Will it possible to...
View ArticleFirm SNP Planned orders and Stock Transfer orders
Hello Gurus We have a requirement where there will be two Optimizer runs one after another. The first Optimizer is to consider only a minimum quantity of demand which needs to be deployed / produced....
View ArticleError while transferring Forecast from DP to ECC
Hello Expert, I am trying to release forecast from DP to ECC in our Development environment.I have followed below steps while doing testing- 1] Created Transfer Profile. Gave Product Location and...
View ArticleSNP Bucket
Hi all I am working in a SNP scenario. Is there any option to just fill one bucket to 100% of capacity with orders from other bucket later? We have a requirement to fill just one day to 100% or maximun...
View Articlebucket resource
Hi all I need to define the resource capacity not in a time unit. I need for exaple 400 cases per day to check capacity in snp. we define capacity in cases per day, not hours available. So in the snp...
View ArticleExtended SNP Horizion
Hi, We started to use extended SNP horizon in Product Master, so we can manually create SNP orders. However, we now see that the source is blank for these orders. When we remove the extended hor., we...
View ArticleDependent Requirement in R/3, is not been CIF to APO as Dependent Demand
Hello Guru, I would like to ask help with regards to our issue, we have a certain material in a plant which is material type is HALB. in MD04 in R/3 it has a Dependent Requirement, but this demand was...
View ArticleSNP PReq creation
Hi Experts, I need your help in understanding the system-behavior for creation of SNP PReqs. We are using SNP heuristic as planning engine. I have two questions here :1. Why system does not create...
View ArticleDP Macro
Hi Gurus,We have DP & PPDS in scope. We wanted to have a macro which calculates the "Target inventory level" based on my forecast using the below formula Months M0...
View ArticleMulti-mix resource
Hi all I want to set up a multi mix resource to have time and capacity in T for example. In the Time-Cont capacity tab I enter MASS and the capacity 20T. The systeme is multipling 20 times 24 hours a...
View ArticleSNP Optimizer - Buck.Horz. "HORTO" log field
Hello guys, I want to understand what is the logic behind Buck.Horz. "HORTO" field from ET_ARCMAT table, at optimizer log. Example: Production environment:Transportation lane duration = 32hBuck. Horz....
View ArticleAvailibity date different from Order End date[SNP optimizer]
Hi All, I need help with understanding the date being calculated here by system. After planning, system created SNP Planned Order with Availability date and 04/07/2016, but the End date for the Planned...
View ArticleSaved Alert Situation bar in Alert Monitor
Hi, Some see this some don't.... Saved Alert Situation bar. What settings drive this ? I thought it was user settings in the Alert monitor > Fav > Generate alerts in the background. but that...
View ArticleCan we use Resource Network functionality with SNP Optimizer?
Hi Experts, As per the different posts on SCN read, i got to know that there is Resource Network Functionality in APO which can be used for process which are used in combination.But this can be only...
View Article