Hello Guru,
I would like to ask help with regards to our issue, we have a certain material in a plant which is material type is HALB. in MD04 in R/3 it has a Dependent Requirement, but this demand was not been CIF to APO as Dependent Demand checking in /N/SAPAPO/RRP3. I have check the material and plant in CFM5 and it has an active CIF Mofel.
Does HALB material type is not been CIF to APO? how can we solve this? any explanation?
Thanks
Edited by: SAP_Totchiki on Apr 13, 2011 3:19 PM