Hi Experts
Here is a scenario for which i need some help. We have multiple locations and these locations can be supplied by one or more distribution centers. The distribution centers need to be planned in APO, but the plants have to be MRP planned. So the scenrio is demand from multiple plants aggregating to distribution center A and demand from another bunch of plants aggregation to dc B. Apart from the demand from the plants the DC' also have their own demand .
I have maintained the hierarchy at material - DC level and I tried to plan the DC's using the SNP aggregate book. But the problem is DC's original demand gets overwritten with the demand from the individual plants. How do i overcome this issue. That is how do i make sure the aggregated demand is the sum of DC's original demand + demand placed by DC's on plants. I want to know if there is any straightforward way of achieving this before modifying the macros to the achieve the same.
Thanks
Saradha
Edited by: Saradha Ramesh on Sep 3, 2010 11:12 PM