Hello:
We are about to Go Live with an SNP Implementation. Part of that is to CIF Routings and Recipes from ECC to APO and have PDSs created. All Routings are CIF'ing properly. For each operation in the Routing, a Work Center might call for Setup in the Scheduling Formula and we might have a rate for this Setup in the Standard Values of the Operation or we might not, but the CIF still sends the PDS either way.
However, we are observing a different situation on the Recipes. If an operation in the Recipe is using a Work Center which has "Duration" in its Scheduling Formula and we do not have a rate in the Duration in the Standard Value of that Operation, then the CIF will fail. If we add a rate on the Duration activity, then it sends the PDS.
Do you know if this is a bug or intended to work this way? (Requiring a rate greater than zero for the Duration Activity in the Scheduling Formula, but not for other Activities).
Thanks.
Andrea