Hello all:
I've sent all Materials, BOMs, Routings, Production Versions from ECC to APO. I am using SNP PDS's. My question is whether I should have to include the finished goods materials, plus the sub assembly materials and raw materials in my Heuristic run? I run both Pegging and Low Level codes (/sapapo/snpllc) programs prior to the Heuristic. I am running a Location Heuristic (I need to run Location, as opposed to Network so I don't interfere with other countries' heuristics which run on the same APO application).
I have checked both:
Take into account found components in planning run
Add products from supersession chains
Source Determination = All Levels
Do Not use Temporary Low Level Codes
Net Change Planning is unchecked
I need to see requirements in the proper Location for all Materials in all levels of the BOM. I expected I would only have to include the finished goods materials in the Heuristic, but it is not creating Planned Orders all the way down to the subs and raws. When I include the sub and raw materials in the Heuristic, it does create the Planned Orders at those levels. I just expected that I would not have to do that since I have the PDS active and see all components in it.
I am running only SNP; not PP/DS.
Thanks for any guidance.
Andrea